Paint factory setup services

Five jobs, not one: formulation, application, testing, raw materials and aftercare. All five under one contract, each with named deliverables, a defined duration and an owner on our side.

Deliverables
22
Duration
2–4 wk · With delivery · Per batch · 15–20 d · 12 mo
2–4 wk

Waterproof coating formulation

The recipe, the process, and the numbers behind both

We select 3 to 5 products for your climate, your local cement and sand, and your target price, then write the formulation, process and spec sheet for each.

A formulation your team can run, with pass criteria for every batch.

Open the scope

Deliverables

  1. F01Product selection for your market, climate and target price
  2. F02Complete formulation: raw material list, dosage of each material, specifications and approved alternatives
  3. F03Production process: order of addition, mixing time and speed, temperature control, filtering and packaging
  4. F04Technical specification sheet, test methods and pass criteria for each product
  5. F05Quality control forms: incoming inspection, in-process checks and finished product release
With delivery

Application guides and detailing

How the product goes on the wall, in pictures and video

A coating applied wrong fails, and the factory gets the blame. Every product ships with a waterproof coating application guide, in print and on video.

Manuals and videos ready to print on packaging and hand to contractors.

Open the scope

Deliverables

  1. A01Application manual per product: substrate requirements, mixing ratio, coats and thickness, recoat time, curing
  2. A02Detailing: internal and external corners, pipe penetrations, floor drains, construction joints, parapets
  3. A03Acceptance methods: water ponding test and thickness checks
  4. A04Training videos and photos, ready for packaging and product brochures
Per batch

Coating testing and QC lab

Data before the formula is final, data before a batch ships

Waterproof coating testing starts with adaptation trials on the cement, sand and water you send us; a trial batch is released only when it meets specification.

Test data your customers' engineers will accept — and the templates to keep producing it.

Open the scope

Deliverables

  1. Q01Adaptation trials with your local cement, sand and water, with reported data
  2. Q02Batch testing and release during trial production
  3. Q03Test data sheets, plus TDS and SDS templates
  4. Q04Support for third-party testing and the documents local certification requires
15–20 d

Waterproof coating raw materials

Key materials from China, bulk materials sourced locally

Emulsions and additives decide performance and are hard to buy locally, so we supply them from China as labelled kits; heavy cement and sand you buy nearby.

Formulation kits labelled by use and dosage, on a stable long-term price.

Open the scope

Deliverables

  1. R01Key materials shipped as kits: emulsions, redispersible powder, cellulose ether, additives, masterbatches, polyurethane prepolymer
  2. R02Local sourcing guidance for cement, sand, calcium carbonate, talc and water, with acceptance checks
  3. R03Inspection report and storage requirements with every material
  4. R04LCL or full-container sea freight to your port; standard materials ship 15–20 days after order
12 mo

Coating plant start-up support

For 12 months after signing, we run the plant with you

Your first three production batches are guided remotely, then for 12 months an engineer who knows your formulation answers within 24 hours on working days.

You are never alone with a failed batch and a waiting customer.

Open the scope

Deliverables

  1. S01Start-up coaching through your first three production batches; on-site engineer available on request
  2. S02Technical response within 24 hours on working days; video calls for urgent issues
  3. S03Free formula adjustment and re-validation when local materials or suppliers change
  4. S04Troubleshooting for production issues (lumps, separation, viscosity) and application issues (blistering, cracking, delamination)
  5. S05Production, QC and application training, plus brochure templates and packaging advice for your own brand

The gap

Everyone sells a piece. We hand over the plant.

Handbook sellers stop at the recipe. Independent consultants stop before quality control. Turnkey plant builders do cover all five blocks, but they build paint and putty lines, not waterproofing lines. Exporters just sell you drums.

Everyone sells a piece. We hand over the plant.
CapabilityJIALAILEFormula handbooksIndependent consultantsTurnkey paint-plant buildersFinished-goods exporters
Waterproof coating formulationCoveredCoveredCoveredCoveredNot covered
Application guides and detailingCoveredNot coveredCoveredCoveredNot covered
Coating testing and QC labCoveredNot coveredNot coveredCoveredNot covered
Waterproof coating raw materialsCoveredNot coveredCoveredCoveredNot covered
Coating plant start-up supportCoveredNot coveredNot coveredCoveredNot covered
Waterproofing depthCoveredCoveredCoveredNot coveredCovered

Read across: five capability blocks plus the one that decides whether the plant makes waterproofing or makes paint.

Talk to an engineer