One-stop solution
Coating plant start-up support
Your first three production batches are guided remotely, then for 12 months an engineer who knows your formulation answers within 24 hours on working days.
For 12 months after signing, we run the plant with you
- Duration
- 12 mo
- Deliverables
- 5
Deliverables
- Start-up coaching through your first three production batches; on-site engineer available on request
- Technical response within 24 hours on working days; video calls for urgent issues
- Free formula adjustment and re-validation when local materials or suppliers change
- Troubleshooting for production issues (lumps, separation, viscosity) and application issues (blistering, cracking, delamination)
- Production, QC and application training, plus brochure templates and packaging advice for your own brand
Open the scope
You are never alone with a failed batch and a waiting customer.
What we do
View allWaterproof coating formulation
The recipe, the process, and the numbers behind both
Application guides and detailing
How the product goes on the wall, in pictures and video
Coating testing and QC lab
Data before the formula is final, data before a batch ships
Waterproof coating raw materials
Key materials from China, bulk materials sourced locally